CAPE OF GOOD HOPE With over 500 wells completed, INTERNATIONAL TRADE PTE. LTD has amassed experience in acidizing and fracturing construction in numerous oil fields both domestically and outside. successfully supplied liquid distribution, fracturing auxiliary production, design and construction design services, and on-site construction technical support for Changqing, Yanchang, Tuha, Zhejiang, CNPC CBM, and Congo Bu oilfields in Africa.
With the use of an improved fracturing method and hydroxypropyl guar gum, a number of technical challenges were resolved in 2016. Party A responded favorably to the building effect. Over fifty hydraulic wells have been finished up to this point.
Six horizontal wells and 61 other wells were fractured in the Ordos Basin between 2014 and 2016. The fracturing chemical items that were supplied were well appreciated by the oilfield construction team.
At Shengli Oilfield, I worked on four horizontal wells as part of the hydraulic fracturing and sand control programs in 2016.
More than 300 oil wells, including more than 200 horizontal wells, have been produced via hydraulic fracturing since 2017. Fracture construction design has been done in addition to traditional oil and gas reservoir fracturing. Using open hole water, bridge plug clustering perforating technology, and quick drilling, horizontal wells have been effectively fractured in several stages and clusters. Rich expertise in multilayer fracturing of horizontal wells has been gathered.
Northern Shaanxi's acidizing and fracturing technology services in 2020